當前位置:首頁 » 礦產開采 » 開采礦石英語怎麼說

開采礦石英語怎麼說

發布時間: 2021-01-09 13:47:57

『壹』 采礦專業英文翻譯

The Ge Ting coal mine is that Zi Bo City Bureau of Mines develops the third pair of the northwest part modernizing a shaft , being located in Shandong Province Ji Ning City building in helping north mining area. The shaft year designs 600,000 tons of efficiency , design the length of service 51. The shaft may cut coal being 3 coal , 16 coal , 17 coal tier mainly , the host mines 3 coal seams. The village , highway pressure coal are grave and , 3 coal seam length of service shortens since shaft geology condition is complicated,be prolong the shaft length of service, decide to exploit 16 , 17 coal, coal matches spirit with 3. And design that condition considers the queen synthetically , put forward opens up a scheme by the geology general situation , well-field range , reserves and 16 , 17 coal seam geology to well-field originally , push and big alleys by the fact that the economy technology ascertains the tie making use of 130 orbits to go up the hill preparing adhesive tape going up the hill comparatively going up the hill exploiting, the mining area being in progress to 1160 mining area designs that. By the analysis to 1160 mining area geology condition, the for sure adopt long unitary make for wall coal mining law , single wing exploits, coal mining handicraft has adopt top grade Pucai , has adopt all caving law to manage a roof, driving face adopt a cannon dig. And carry out equipment choosing a type , arrange turn out system after ascertaining the mining area parameter, work out safe technology measure. Keywords: Well-field opens up , mining area , make for increase wall coal mining law , top grade Pucai

『貳』 采礦專業 英語翻譯

本設計是達茂鐵礦露天開采的工藝與開拓設計,年產量200萬噸。This opencut exploitation and pioneer design is applied to Damao Iron Mine, with an annual output of approximately 2 million tons.
採用境界剝采比不大於經濟合理剝采比的原則圈定露天開采境界。Open-pit boundary is contoured with the application of the rule of boundary stripping ratio less than or equal to economic stripping.
並進行可采儲量及平均剝采比的計算。And make a caculation of proved reserves and average stripping ratio.

用礦山延伸速度驗證生產能力。Throughput is verified by extension rate of the mine.

編制露天礦採掘進度計劃時,平均剝采比乘系數的方法初定生產剝采比,電鏟的效率根據類似礦山選取。 When working out the open-pit excavation schele, proction stripping ratio is initially decided by the approach of average stripping ratio mutiplied by coefficient while efficiency of electric shovel selected on the basis of similar mines.
本礦採用斜坡汽車螺旋坑線開拓。 The mine is exploited by vehicles along the slope of the spiral pit-line.
工藝部分包括穿孔設備選型及其數量的計算、電鏟設備的選型及其數量的計算、汽車數量的計算及選型、推土機選型及數量計算、輔助設備的選型及數量的計算等。Techniques include the selection and caculation of drilling equipments,electric shovels,vehicles,bulldozer as well as assistant auxiliary equipments.
爆破方法是選擇及葯量計算,運輸調車方式是選擇,排土方法的選擇及排土計算。 Blasting method is the selection of dosage and caculation;shunting method is the selection as well as the selection of mping and and mping caculation.
關鍵詞:露天開采 開拓 工藝 採掘進度計劃
Key words: open-pit exploitation;excavation;techniques;excavation schele

同學,累死我了;一個多小時翻譯的你的這篇文章,^_^。

『叄』 開採的英文,銅礦石,鎳礦石開採的翻譯,怎麼用英語

你好!
銅礦石,鎳礦石開采
Copper ore, nickel ore mining

『肆』 采礦用英語怎麼說

您好!
很高來興為你翻譯、自解釋。您提出的采礦用英語怎麼說?

只有專業說法:mining(漢字注音:埋嶺)最准確。(漢語含義:n.采礦, 礦業)可做動名詞。
英語的其他表達方式均不能准確地表達「采礦」的動名詞。

例如:mine pron.我的;n.礦, 礦山, 礦井, 源泉, 寶庫, 地雷, 水雷;vt.挖掘, 開采, 在...布雷, 破壞
vi.開礦, 埋設地雷等,只適合做「開礦」的動詞

希望我的翻譯、解釋對你有幫助,祝你心想事成!

『伍』 采礦英語翻譯

This design altogether nine chapters, respectively are the general remarks, the technical economy, the mining geology, mining, the mining slope ramp design, the mine ventilation design, the mining machinery, the assembly drawing transportation, safe specially. And mining, the mining machinery, the mining slope ramp project are the design main bodies, in mining used advanced low poor has damaged the non-lower column partition to come down the law, will have the huge economic efficiency, the special mining slope ramp project, mainly included the slope ramp position the determination, the slope ramp form choice, the slope ramp cross section specification, the slope ramp slope, slope ramp aspect and so on curve design, slope ramp construction contents. Some parts of designs contain the essential blueprint, the blueprint must defer to the concerned requirements plan.

『陸』 粒度(礦石)英語怎麼說

粒度(礦石)英語翻譯過來可以這么說:Granularity
(ore),見下圖網路翻譯

『柒』 英語勘探采礦翻譯

附件1:勘探計劃

簡介
根據新近調查發現,本計劃重訂了成本估計,這將明顯給資源/財力/物力產生積極影響。在最終版鑽探計劃前,就目前這一步,要做到精確無誤尚不成熟,但依靠眾服務提供商、以促成本計劃,可以得到近似報價。
要知道,(因各種化驗耗費而削減成本,)迄今得到的所有結果都建立在選擇抽樣的基礎之上,並且根據對硫化物的目測得來,這一點很重要。因此,更為重要的是,一氧化氮樣品分析不包括在掘溝消減之內。金剛石鑽頭在氧化帶作用微乎其微,反而有礙采樣。
無論陸台地質(學)還是整體變質結構仍未(被學界——譯者添)獲知,從褶皺角度看,顯然更為復雜。就其本身而言它是有利的,這樣增加了陸台區深入地層縱深、形成富礦(=豐富礦床)的可靠性也許EL 017號一個鑽洞(就能做到這一點——譯者添)。其餘鑽洞也能接近這些finges(疑似拼寫有誤、且影響前touch的對譯——譯者追問),但主要在北部(近乎垂直的)支線礦床鑽探。此外,金礦/黃金需用半核岩芯進行分析/化驗。應牢記淺生礦床帶並未采樣、也不算在各種資源之內。
本鑽探計劃包括(可深達)2,000米的RC/RAB型鑽頭(或:鑽井,個人傾向前者,LZ高見?),以在開發早期、對淺生礦床帶露天底坑進行評估,同時這也為陸台結構及第二個未經試驗的近地表岩層進行闡釋。

『捌』 礦業英語翻譯

1.碎裂復是指將礦石或岩石用爆破方製法分解,以便裝卸與運輸。碎裂的最佳效果是顆粒不小於運輸要求,不大於需要手工破碎或二次爆破。
2. 這種方法非常昂貴,因為在生產開始前必需投入大量資金,用於鋪設道路以便通行。因此,它也不如長壁開采法受歡迎。它的另一缺點是,不如機械釘板、立柱、長壁開采法可行。

『玖』 采礦業的英語翻譯 采礦業用英語怎麼說

采礦業

[工經][礦業] mining instry更多釋義>>

[網路短語]

  • 采礦業mining;Mining Instry;Mining and Quarrying

  • 采礦業協會回National Mining Association

  • 采礦業發展答mining instry development

『拾』 采礦工程專業英語翻譯

對於繼續采礦來說,一次性打入兩處是有效率的。通常在采礦中,每內個機器打入至少一次需要5次操作容。最理想最高效的是將打入總次數控制在7-10次。因為在確保安全的前提下,不考慮產品,16處平行打入,能夠提供足夠的通風以及搬運容量。因此最少5個主要入口常應用於將開放式礦井開采為裸礦,如數據8.2所示,

熱點內容
三個字的電影名 發布:2024-08-19 09:10:03 瀏覽:417
台灣紅羊經典電影 發布:2024-08-19 09:02:17 瀏覽:767
搞笑電影范冰冰梁家輝開戰 發布:2024-08-19 08:53:18 瀏覽:917
免費午夜激情 發布:2024-08-19 08:42:15 瀏覽:831
40分鍾左右的英語電影 發布:2024-08-19 08:28:43 瀏覽:695
電影宋基美娜 發布:2024-08-19 08:27:04 瀏覽:942
宿舍都變成女的的電影 發布:2024-08-19 07:59:35 瀏覽:897
台灣恐怖片喪屍 發布:2024-08-19 07:57:21 瀏覽:179
免費觀看qq群 發布:2024-08-19 07:53:00 瀏覽:921
4級片名字 發布:2024-08-19 07:39:14 瀏覽:553