开采矿石英语怎么说
『壹』 采矿专业英文翻译
The Ge Ting coal mine is that Zi Bo City Bureau of Mines develops the third pair of the northwest part modernizing a shaft , being located in Shandong Province Ji Ning City building in helping north mining area. The shaft year designs 600,000 tons of efficiency , design the length of service 51. The shaft may cut coal being 3 coal , 16 coal , 17 coal tier mainly , the host mines 3 coal seams. The village , highway pressure coal are grave and , 3 coal seam length of service shortens since shaft geology condition is complicated,be prolong the shaft length of service, decide to exploit 16 , 17 coal, coal matches spirit with 3. And design that condition considers the queen synthetically , put forward opens up a scheme by the geology general situation , well-field range , reserves and 16 , 17 coal seam geology to well-field originally , push and big alleys by the fact that the economy technology ascertains the tie making use of 130 orbits to go up the hill preparing adhesive tape going up the hill comparatively going up the hill exploiting, the mining area being in progress to 1160 mining area designs that. By the analysis to 1160 mining area geology condition, the for sure adopt long unitary make for wall coal mining law , single wing exploits, coal mining handicraft has adopt top grade Pucai , has adopt all caving law to manage a roof, driving face adopt a cannon dig. And carry out equipment choosing a type , arrange turn out system after ascertaining the mining area parameter, work out safe technology measure. Keywords: Well-field opens up , mining area , make for increase wall coal mining law , top grade Pucai
『贰』 采矿专业 英语翻译
本设计是达茂铁矿露天开采的工艺与开拓设计,年产量200万吨。This opencut exploitation and pioneer design is applied to Damao Iron Mine, with an annual output of approximately 2 million tons.
采用境界剥采比不大于经济合理剥采比的原则圈定露天开采境界。Open-pit boundary is contoured with the application of the rule of boundary stripping ratio less than or equal to economic stripping.
并进行可采储量及平均剥采比的计算。And make a caculation of proved reserves and average stripping ratio.
用矿山延伸速度验证生产能力。Throughput is verified by extension rate of the mine.
编制露天矿采掘进度计划时,平均剥采比乘系数的方法初定生产剥采比,电铲的效率根据类似矿山选取。 When working out the open-pit excavation schele, proction stripping ratio is initially decided by the approach of average stripping ratio mutiplied by coefficient while efficiency of electric shovel selected on the basis of similar mines.
本矿采用斜坡汽车螺旋坑线开拓。 The mine is exploited by vehicles along the slope of the spiral pit-line.
工艺部分包括穿孔设备选型及其数量的计算、电铲设备的选型及其数量的计算、汽车数量的计算及选型、推土机选型及数量计算、辅助设备的选型及数量的计算等。Techniques include the selection and caculation of drilling equipments,electric shovels,vehicles,bulldozer as well as assistant auxiliary equipments.
爆破方法是选择及药量计算,运输调车方式是选择,排土方法的选择及排土计算。 Blasting method is the selection of dosage and caculation;shunting method is the selection as well as the selection of mping and and mping caculation.
关键词:露天开采 开拓 工艺 采掘进度计划
Key words: open-pit exploitation;excavation;techniques;excavation schele
同学,累死我了;一个多小时翻译的你的这篇文章,^_^。
『叁』 开采的英文,铜矿石,镍矿石开采的翻译,怎么用英语
你好!
铜矿石,镍矿石开采
Copper ore, nickel ore mining
『肆』 采矿用英语怎么说
您好!
很高来兴为你翻译、自解释。您提出的采矿用英语怎么说?
只有专业说法:mining(汉字注音:埋岭)最准确。(汉语含义:n.采矿, 矿业)可做动名词。
英语的其他表达方式均不能准确地表达“采矿”的动名词。
例如:mine pron.我的;n.矿, 矿山, 矿井, 源泉, 宝库, 地雷, 水雷;vt.挖掘, 开采, 在...布雷, 破坏
vi.开矿, 埋设地雷等,只适合做“开矿”的动词
希望我的翻译、解释对你有帮助,祝你心想事成!
『伍』 采矿英语翻译
This design altogether nine chapters, respectively are the general remarks, the technical economy, the mining geology, mining, the mining slope ramp design, the mine ventilation design, the mining machinery, the assembly drawing transportation, safe specially. And mining, the mining machinery, the mining slope ramp project are the design main bodies, in mining used advanced low poor has damaged the non-lower column partition to come down the law, will have the huge economic efficiency, the special mining slope ramp project, mainly included the slope ramp position the determination, the slope ramp form choice, the slope ramp cross section specification, the slope ramp slope, slope ramp aspect and so on curve design, slope ramp construction contents. Some parts of designs contain the essential blueprint, the blueprint must defer to the concerned requirements plan.
『陆』 粒度(矿石)英语怎么说
粒度(矿石)英语翻译过来可以这么说:Granularity
(ore),见下图网络翻译
『柒』 英语勘探采矿翻译
附件1:勘探计划
简介
根据新近调查发现,本计划重订了成本估计,这将明显给资源/财力/物力产生积极影响。在最终版钻探计划前,就目前这一步,要做到精确无误尚不成熟,但依靠众服务提供商、以促成本计划,可以得到近似报价。
要知道,(因各种化验耗费而削减成本,)迄今得到的所有结果都建立在选择抽样的基础之上,并且根据对硫化物的目测得来,这一点很重要。因此,更为重要的是,一氧化氮样品分析不包括在掘沟消减之内。金刚石钻头在氧化带作用微乎其微,反而有碍采样。
无论陆台地质(学)还是整体变质结构仍未(被学界——译者添)获知,从褶皱角度看,显然更为复杂。就其本身而言它是有利的,这样增加了陆台区深入地层纵深、形成富矿(=丰富矿床)的可靠性也许EL 017号一个钻洞(就能做到这一点——译者添)。其余钻洞也能接近这些finges(疑似拼写有误、且影响前touch的对译——译者追问),但主要在北部(近乎垂直的)支线矿床钻探。此外,金矿/黄金需用半核岩芯进行分析/化验。应牢记浅生矿床带并未采样、也不算在各种资源之内。
本钻探计划包括(可深达)2,000米的RC/RAB型钻头(或:钻井,个人倾向前者,LZ高见?),以在开发早期、对浅生矿床带露天底坑进行评估,同时这也为陆台结构及第二个未经试验的近地表岩层进行阐释。
『捌』 矿业英语翻译
1.碎裂复是指将矿石或岩石用爆破方制法分解,以便装卸与运输。碎裂的最佳效果是颗粒不小于运输要求,不大于需要手工破碎或二次爆破。
2. 这种方法非常昂贵,因为在生产开始前必需投入大量资金,用于铺设道路以便通行。因此,它也不如长壁开采法受欢迎。它的另一缺点是,不如机械钉板、立柱、长壁开采法可行。
『玖』 采矿业的英语翻译 采矿业用英语怎么说
采矿业
[工经][矿业] mining instry更多释义>>
[网络短语]
采矿业mining;Mining Instry;Mining and Quarrying
采矿业协会回National Mining Association
采矿业发展答mining instry development
『拾』 采矿工程专业英语翻译
对于继续采矿来说,一次性打入两处是有效率的。通常在采矿中,每内个机器打入至少一次需要5次操作容。最理想最高效的是将打入总次数控制在7-10次。因为在确保安全的前提下,不考虑产品,16处平行打入,能够提供足够的通风以及搬运容量。因此最少5个主要入口常应用于将开放式矿井开采为裸矿,如数据8.2所示,